UMI Staff Publications
Permanent URI for this communityhttps://umispace.umi.ac.ug/handle/20.500.12305/332
Browse
Browsing UMI Staff Publications by Author "Byaruhanga, Aloysius"
Now showing 1 - 1 of 1
- Results Per Page
- Sort Options
Item Performance of Road Infrastructure Projects in Uganda: A Procurement Approach(THE UGANDAN JOURNAL OF MANAGEMENT AND PUBLIC POLICY STUDIES, 2018-11) Muzaale, Tonny; Auriacombe, Christelle; Byaruhanga, AloysiusAdequate infrastructure is critical to economic growth and competitiveness of a nation; hence the current inadequate infrastructure is impeding the expected growth of Uganda. This study examined the performance of road infrastructure projects in Uganda. The study relied on primary and secondary data which was analysed basing on content thematic analysis and regression analysis. Performance was measured in terms of time, cost and quality. Major road projects in the country have been completed with signifi cant cost and time overruns. There were time and cost overruns on several road projects namely: Kyenjojo-Kabwoya-Hoima-Bulima road, Mubende-Kakumiro road, Kyenjojo road, Mukono-Katosi road and Kisoga-Nyenga road. Use of poor quality materials, poor scheduling, delayed procurement and specifi cation have caused time overruns on the road construction projects. Delays have had an adverse impact on project success. Today the effects of road construction delays have not been confi ned to the construction industry only, but have ended up affecting the overall economy of a country. It is prudent and judicious that the contractor management and monitoring process should be improved for all ongoing road construction works.