The study focused on the effect of donor fund management on the performance of Rural
Electrification programme in Uganda using Kisiizi and West Nile projects as case studies. With
the liberalization of the energy sector, came privatization of projects. The interaction of Donors,
Government and the Private Sector changed the dynamics in electrification. There was slow
progress on delivery of electricity to rural areas and objectives of the projects were not realized,
making projects ineffective in transforming rural life. The study adopted a cross sectional case
study design and used both qualitative and quantitative approaches. From a population of 271 a
sample of 159 elements was selected. Systematic and purposive sampling techniques were then
used to select elements from the sample. The data collection methods used included
questionnaire, interviewing, documentary review and observation. Quantitative data were
analysed using SPSS to generate frequencies and percentages of responses and qualitative data
were manually analysed. Using Pearson’s correlation coefficient, the findings indicate that
resource planning has a moderate significant positive relationship at 0.261, implementation had,
moderate significant positive relationship at 0.255, cost control had moderate significant positive
relationship at 0.400, and political will had moderate significant positive relationship at 0.111.
Lessons learnt from the study are:: all indicators of resource planning especially time should be
adhered to, for the effectiveness of a project. Project implementation is a crucial phase in project
management; therefore Government should play its part in Monitoring and evaluating
periodically to mitigate any unforeseen circumstances. The cost control process was unique with
Government and World Bank having different procedures and guidelines which the private
developer was not familiar with as a new player. Political will was influential in negotiating and
acquiring funds from donors but interference hindered the effectiveness of projects.